• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2-78. Preparation for Movement - cont - TM-10-4610-215-10_125
Figure   2-78.   Preparation   for   Movement   (Sheet   5   of   5)   (Army   ModeL   No.   600-1)

TM-10-4610-215-10 Water Purification Unit Reverse Osmosis 600 GPH Trailer Mounted Flatbed Cargo 5 Ton 4 Wheel Tandem Rowpu Model 600-1 Manual
Page Navigation
  105    106    107    108    109  110  111    112    113    114    115  
TM    10-4610-215-10 TM   08580A-10/1 6. WITH CRANK HANDLE (14) IN POSITION ON FRONT JACK (16), TURN CRANK HANDLE (14) COUNTERCLOCKWISE  AND  FULLY  RAISE  JACK  PAD 10.  PULL  OUT  SPRING-LOADED  LOCKING  PIN  (22)  ON JACK SWIVEL ASSEMBLY (23); ROTATE JACK (16) TO HORIZONTAL (STOWED) POSITION, ALLOW LOCKING PIN (22) TO SPRING SACK TO LOCKED POSITION. 9. REPLACE CRANK HANDLE (14) ON REAR OF JACK SUPPORT  BRACKET  (15);  INSTALL  SAFETY  PIN  (13). 11.  REMOVE  AIR  HOSES  (24)  FROM  DUMMY COUPLINGS (26) ON TRAILER DRAWBAR (26) ANd CONNECT  THEM  TO  TOWING  VEHICLE. Figure   2–78.   Preparation   for   Movement   (Sheet   4   of   5)   (Army   Model   No.   600-1) (21). 2-92







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.