TM 10-4610-229-10
2-5. STARTUP (CONT)
3 Adjust speed control screw on boost pump to give 50 psi (3. 4 kPa x 100) on gauge PI-1 on pretreatment
assembly. Turn right to increase speed. Turn left to decrease speed.
g. Pretreatment Assembly Startup
1 Turn COAGULANT PUMP and INHIBITOR PUMP switches to ON.
2-102