• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure  2-56.  High  Pressure  Solenoid  Valve
Figure  2-57.  TDS  Meter  Cables

TM-10-4610-232-34 Water Purification Unit Reverse Osmosis 3 000 GPH Trailer Mounted Flatbed Cargo 22-1/2 Ton 8 Wheel Tandem Model No. WTA-060 Manual
Page Navigation
  195    196    197    198    199  200  201    202    203    204    205  
TM   10-4610-232-34 REASSEMBLY. NOTE When installing block valve, make sure arrow is pointing down. a. Install nipple (22) and block valve (3) on solenoid valve (21). b. Install fitting (15) on solenoid. c. Reassemble back of solenoid valve (21). (1) Assemble seat screw (38) and spacer (39) into valve body (40). Tighten screw to secure. (2)  Screw  stem  stop  (34)  with  stem  (35)  and  stem  spring  (36)  and  install  into  detent  plunger.  Tighten  screw  to secure. (3) Install spring (33) on detent plunger (37). Install preformed packing (32) and plunger into valve body. (4) Screw cylinder cap (31 ) into valve body (40). Tighten to secure. d. Reassemble front of valve (1) Install preformed packing (30) and lower end plate (29) on cylinder cap (31). (2) Install heat shrink tubing on coil wires as described in para. 2-7 NOTE When installing coil cover on cylinder cap, ensure that coil wires are aligned with air inlet port. (3) Install coil (28) and preformed packing (27) into coil cover (26). Install onto cylinder cap (31 ). (4) Install preformed packing (25) and identification plate (24) with screw (23) into cylinder cap (31). Tighten screw to secure. (5) Install sealing washer (21 D), adapter body (21 C), bushing (21 B) and nut (21A) onto solenoid valve (21). (6) Install cable connector as described in para. 2-7. Install solenoid valve (21) and secure with U-clamp (20), flatwashers (19), Iockwasher (18) and nut (17). Connect cable P28 (16) to main harness J28. Install “OUT” line (14) to fitting (15). Install “IN” line (11) to elbows (12) and (13) and secure with tubing nuts. Place panel (4) into position by sliding it under edge of storage box (10). INSTALLATION. a. b. c. d. e. (1) Install and secure screws (9). (2) Insert fasteners (7) into tie down brackets (8) and insert into position (3) Secure by installing washers (6) and nuts (5). Tighten securely. f. Close air filter blowdown valve (2) and solenoid block valve (3). g. Turn compressor to “ON”. h. Open air tank valve (1). i. Check for air leaks. Tighten fittings if necessary using soapy water. j. Check for leaks through the solenoid valve when it  IS closed. 2-182   Change   1







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.