• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Operator/Crew Preventive Maintenance Checks and Services (Unit) (Continued) - TM-10-4610-239-10_63
Figure 2-17.  Preparation For Use (Sheet 1 of 4)

TM-10-4610-239-10 Water Purification Unit Reverse Osmosis 600 GPH Trailer Mounted Flatbed Cargo 5 Ton 4 Wheel Tandem Model 0996109001 Manual
Page Navigation
  45    46    47    48    49  50  51    52    53    54    55  
TM 10-4610-239-10 TM 08580B-10/1 SECTION III.  OPERATION UNDER USUAL CONDITIONS 2-21. CHOOSING THE SITE.  When choosing the site to set up and run the ROWPU, remember the following: a. If a stream is to be used as the raw water source, pick a site for the ROWPU upstream from camp. WARNING Ensure  that  the  site  provides  downstream  waste water drainage away from the water source. CAUTION Consider variable weather conditions when choosing   site;   avoid    areas    vulnerable    to    flash flooding. NOTE Illustration denotes Army ROWPU.  MC unit is skid mounted. Figure 2-16.  Site Diagram b. The raw water hoses can reach about 75 feet.  Ensure the ROWPU is placed close enough for the hoses to reach the stream or lake, and check that the ground is solid and fairly level. c. Take advantage of available forest cover. d. Take advantage of finished roads.  They can furnish a solid, level surface. 2-22. PREPARATION FOR USE.  Upon reaching the operating area, prepare the ROWPU for operation.  For Army unit, refer  to  figures  2-17  (Model  No.  0996109001)  and  2-18  for  trailer  set-up,  then  follow  para.  2-22a  through  2-22  ad.    For skid-mounted units (Model No. 0996108001), skip to para. 2-22 a through 2-22 ad. 2-31







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.