• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SECTION II. EQUIPMENT DESCRIPTION AND DATA - TM-10-4610-244-13_11

TM-10-4610-244-13 Hypochlorination Unit NSN 4610-01-364-4485 Model AHY001 Manual
Page Navigation
1  2    3    4    5    6  
TM 10-4610-244-13 TM 09476B-13/1 SECTION I.  GENERAL INFORMATION. 1-1.  SCOPE. a. Type of Manual.  Operator, Unit, and Direct Support Maintenance Manual. b. Model Number and Equipment Name.  Model AHYOO1 Hypochlorination Unit. c. Purpose  of  Equipment.    The  hypochlorination  unit  covered  in  this  manual  is  to  be  used  in  water  storage  and distribution systems to chlorinate water. 1-2.  MAINTENANCE FORMS AND PROCEDURES.  Department of the Army forms and procedures used for equipment maintenance  will  be  those  prescribed  by  DA  PAM  738-750,  The  Army  Maintenance  Management  System  (TAMMS) (Maintenance Management UPDATE). 1-3.  CORROSION PREVENTION AND CONTROL (CPC).  Corrosion Prevention and Control (CPC) of Army material is a continuing concern.  It is important that any corrosion problems with this item be reported so that the problem can be corrected and Improvements can be made to prevent the problem In future items. While corrosion is typically associated with rusting of metals, it can also include deterioration of other materials such as rubber and plastic Unusual cracking, softening, swelling, or breaking of materials may be a corrosion problem. If a corrosion problem is identified, it can be reported using Standard Form 368, Product Quality Deficiency Report.  Use of  key  words  such  as  "rust",  "deterioration",  "corrosion",  or  "cracking"  will  insure  that  the  information  is  identified  as  a CPC problem.  The form should be submitted to the address specified in the DA PAM 738-750. 1-4.    DESTRUCTION  OF  ARMY  MATERIAL  TO  PREVENT  ENEMY  USE.    Refer  to  TM  750244-3,  Procedures  for Destruction of Equipment to Prevent Enemy Use. 1-5.    REPORTING  EQUIPMENT  IMPROVEMENT  RECOMMENDATIONS  (EIR).    If  the  hypochlorination  unit  needs improvement,  let  us  know  Send  us  an  EIR.    The  user  is  the  only  one  who  can  tell  us  how  the  equipment  can  be improved.    Let  us  know  why  you  do  not  like  the  design  or  operation  Put  it  on  an  SF  368  (Product  Quality  Deficiency Report) Mail it to Commander, U.S Army Aviation and Troop Command  ATTN  AMSAT-I-NLDO,4300 Goodfellow Blvd., St Louis, MO 63120-1798; or Commanding General, Code 850, Marine Corps Logistics Base, 814 Radford Blvd., Albany, GA  31704-1128.  We will send you a reply. 1-6.  WARRANTY INFORMATION.  Warranty coverage is for a twelve-month period from date of issue not to exceed one  year  from  date  of  delivery  as  shown  on  the  Material  Inspection  and  Receiving  Report  (DD  Form  250)  Report  all defects in material or workmanship to your supervisor. 1-2







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.