• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE OF PUMPER ASSEMBLY - cont - TM-10-4610-246-13_71
MAINTENANCE OF TOOL BOX ASSEMBLY - TM-10-4610-246-13_73

TM-10-4610-246-13 Hypochlorination Unit 360 GPM (NSN 4610-01-410-7179) Model No. WALOO1HYPO (EIC:ZJ2) Manual
Page Navigation
  60    61    62    63    64  65  66    67    68    69    70  
TM 10-4610-246-13 4.21 MAINTENANCE OF PUMPER ASSEMBLY - (Cont) (7) Install two screws (2) through flange (3), water side diaphragm (4), and cylinder (1), and tighten enough to hold assembly together. (8) Install and tighten all remaining six screws. (9) Lubricate and install stud (7, Figure 4-12) on chemical side diaphragm (6). (10) Install chemical side diaphragm (6). Make sure holes line up. (11) Install pumphead (3), making sure one of fittings for discharge and suction valves will line up with drain when installed. Secure with eight screws (1) and washers (2). f. Installation. Install gasket (3, Figure 4-11) and pump assembly (2) on upper main case assembly (4) and secure with two screws (1). 4-23







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.