TM 5-4610-233-13&P
4-31. REPLACE PRESSURE GAGE.
This task covers:
a. Remove.
b. Inspect.
c. Install.
INITIAL SETUP
a. Tools. Tool Kit (Appx B, Sect Ill, Item 1).
b. Materials/Parts. Tape, Antiseize (Appx E, Sect II, Item 4).
c. Equipment Condition. Hypochlorination unit removed from water supply line.
REMOVE
Remove pressure gage
INSPECT
(1), brass elbow (2), and brass nipple (3).
Inspect pressure gage, brass elbow, and brass nipple for damaged threads and cracks. Replace as required.
INSTALL
NOTE
Apply Antiseize tape to all metal to metal pipe connections.
Install pressure gage (1), brass elbow (2), and brass nipple (3).
END OF TASK
4-40
Change 2