• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Replacement.
Section VII.  Manufacturers' warranties/guarantees - TM-55-1930-209-14P-13_83

TM-55-1930-209-14P-13 Water Purification Barges (1930-01-234-2165) Equipment Montoring System Manual
Page Navigation
  60    61    62    63    64  65  66    67    68    69    70  
TM 55-1930-209-14&P-13 Section V.  Storage 3-20  Short-term storage.  If barge is to be taken out of service for more than 7 days but less than 30 days, and bow crane system is not to be used while in storage, perform following. a. Shut down system. b. Perform after operation maintenance. 3-21  Administrative storage.  When bow crane is taken out of service for more than 30 days but less than 6 months, barge  remains  a  unit  responsibility  and  is  maintained  by  unit  personnel.    Before  placing  in  administrative  storage, perform the following. a. Shut down system. b. Perform after operation maintenance. c. Perform monthly maintenance requirements. 3-21.1    Administrative  storage  inspection.    Bow  crane,  if  not  used  during  administrative  storage,  will  be  inspected every 30 days for corrosion, damage, or pilferage.  Correct as necessary. 3-22  Long-term storage.  If barge is to be taken out of service for 6 months or more, turn it in to depot for preparation and placement into long-term storage.  If barge is in administrative storage and is to be taken out of service and placed in  depot  long-term  storage  (6  months  or  more),  process  barge  and  bow  crane  system  for  normal  operations  before releasing to depot. Section VI.  Manufacturers' service manuals/instructions 3-23  General.  These references provide additional information on bow crane components.  A ready reference copy is in Appendix B.  Refer to both this manual and drawings listed in Appendix A while performing procedures in these manuals. Component Document Title Manufacturer FASSI bow crane, F-10, Terms of Warranty, FASSI Gru Idrauliche Model F10.3 Use, and Maintenance Supplier: Morgan Crane Co., Inc. F-10 Spare Parts Catalogue 1009e Chestnut Avenue Santa Ana, CA 92701 Anti-2-block System Mark H Installation Krueger Crane Systems, Inc. and Checklist, Trouble- 4699 Colt Road shooting List Rockford, IL 61109 Ph: (815) 874-9402 3-29







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.