TM 5-193-209-14&P-4
Section III. Long-term storage
5-3 Long-term storage. If barge is to be taken out of service for 6 months or more, turn it in to depot for preparation
and placement into long-term storage. If barge is in administrative storage and is to be taken out of service and place in
depot long-term storage (6 months or more), process chlorination system for normal operations as specified below before
releasing to depot.
a.
Perform before operation checks in Appendix C.
b.
Operate chlorination system as given in Appendix C.
c.
Perform during operation checks in Appendix C.
d.
Perform after operation checks in Appendix C upon completion of normal operation.
e.
Upon successful completion of operation and inspection, release barge to depot for processing into long-term
storage.
5-2