VI.  RECOMMENDATIONS FOR DEPLOYMENT AND RETRIEVAL
Winch Drive Start-Up

TM-55-1930-209-14P-6 Water Purification Barges (NSN 1930-01-234-2165) Chlorination System Manual
Page Navigation
  537    538    539    540    541  542  543    544    545    546    547  
1.0 ROWPU Barge Set-Up A. Close water gate valves #1 and 2. B. Close air supply valve 03. C. Connect barge water supply to Valve #1. D. Connect air supply to valve #3. E. Free the end of the discharge line.  Check that pulling head is secured to the coupling. F. Check that the winch band brake is set. G. Release winch drum tie-downs, if any. H. Check that winch control lever is in OFF position. I. Attach towline from shore to pulling head. J. Attach a 500 lbs.  buoyancy float to the pulling head.  This will prevent embedment of the end-fitting in the sea- bottom.