Pipe Deployment
Pigging - TM-55-1930-209-14P-6_579

TM-55-1930-209-14P-6 Water Purification Barges (NSN 1930-01-234-2165) Chlorination System Manual
Page Navigation
  541    542    543    544    545  546  547    548    549    550    551  
4.0 Water Discharge A. Open valve at shore receiving station. B. Open gate valves #1 and 2. C. Start pumping. D. The  configuration  of  the  flexible  pipe  should  be  regularly  verified  to  ensure  that  the  line  is  not  subjected  to excessive stress.