• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Preventive Maintenance Checks and Services for Shore Discharge System (Continued) - TM-55-1930-209-14P-6_70
DRINKING WATER DISCHARGE SYSTEM OPERATIONS AND MAINTENANCE MANUAL

TM-55-1930-209-14P-6 Water Purification Barges (NSN 1930-01-234-2165) Chlorination System Manual
Page Navigation
  52    53    54    55    56  57  58    59    60    61    62  
TM 55-1930-209-14&P-6 Table C-1.  Preventive Maintenance Checks and Services for Shore Discharge System (Continued) B - Before D - Daily Q - Quarterly D - During W - Weekly S - Semiannually A - After M - Monthly A - Annually Interval Procedures Item Check For And Have Equipment Item To Be Repaired Or Adjusted Is Not Ready/ No. B D A D W M Q S A Inspected As Necessary Available If (7)  Replace hydraulic fluid in power unit reservoir.  Fill with Gulf Harmony, 46 AW or Military equivalent. 16                • Swivel Joint Lubricate with No. 2 bearing grease or military equivalent. C-10







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.