TM 55-2090-201-14&P
2-4 OPERATING UNDER USUAL CONDITIONS (Continued).
PRESTART CHECKS (Continued).
D.
Open the inlet valve
located on the inlet
line to the prefilter
separator.
E.
Open the intervessel
shutoff valve located
between the 1st (pre-
filter) and 2nd stages
Open the water dis-
charge valve at base
of 2nd stage.
6.
Inlet Valve
7.
Prefilter Separator
8.
Intervessel Shutoff Valve
9.
Water Discharge Valve
Figure 2-7.
Start-up and Operating Procedures, Type C and D
Separators (Sheet 2 of 4).
2-22