LUBRICATION ORDER
LO 10-4610-240-12 (ARMY)
LI 08580C-12 (MARINE CORPS)
TO 40W4-13-31 (AIR FORCE)
15 OCTOBER 1992
(SUPERSEDES LO 5-4610-240-12, 15 November 1991
WATER PURIFICATION UNIT, REVERSE OSMOSIS
600 GPH, TRAILER MOUNTED, FLATBED CARGO,
5 TON, 4 WHEEL TANDEM ROWPU
AND
600 GPH SKID MOUNTED ROWPU
References: TM 104610-240-10 and
Federal Supply Catalog C9100-IL.
Approved for public release; Distribution is unlimited
REPORTING OF ERRORS
You can improve this publication by calling attention to errors and by recommending improvements and by
stating your reasons for the recommendations. Your letter or DA Form 2028, Recommended Changes to
Publications and Forms, should be mailed directly to: Commander, U. S. Army Troop Support Command,
ATTN: AMSTR-MMTS, 4300 Goodfellow Blvd., St. Louis, MO 63120-1798.
Marine Corps users submit NAVMC 10772 form to: Commanding General (Code 850), Marine Corps
Logistics Base, Albany, GA 31704-5000.
Air Force personnel submit AFTO FORM 22 in accordance with T.O. 005-1.
This LO is for operator/crew (C) or unit (O) maintenance. Lube intervals (on-condition or hard time) are based on normal
operation. Lube during constant use, and less during inactive periods. The task-hour specified is the time you need to do
all the services prescribed for a particular interval. Use correct grade of lubricant for seal temperature expected.
For equipment under manufacturers warranty, hard time oil service intervals shall be followed. Intervals shall be short-
ened if lubricants are known to be contaminated or if operation is under adverse conditions (such as longer than usual
operating hours, extended idling periods, extreme dust).
Chemical feed pump and R.O. pump oils must be sampled at 100 hour intervals as prescribed by TB 43-106. On-
condition (OC) oil sample intervals shall be applied unless changed by the Army Oil Analysis Program (AOAP) laboratory.
Ensure ROWPU is level before checking oil levels in chemical feed pump and R.O. pump. Drain oils while they are warm.
Lubricate trailer immediately after fording, or as soon after unit movement permits. Dry equipment before lubricating.
On the picture, a dashed line (--) means there are lubrication points on both sides of the equipment.
Card 1 of 8