TM 10-4610-232-12
(1)
Group
Number
02
0206
0207
0208
0209
0210
0211
0212
0213
0214
0215
0216
S E C T I O N I I . M A I N T E N A N C E A L L O C A T I O N C H A RT
FOR 3000 GPH ROWPU (Continued)
(2)
Component/
Assembly
WATER PURIFICATION
SYSTEM (cont.)
l . High Pressure
Air Tubing
l l LOW Pressure
Water Tubing
and Hoses
l l High Pressure
Water Piping,
Tubing and Hoses
l l Chemical
Tubing
. Electrical Installation
. Pressure Gage
Assemblies
. Main Control Panel
l l Cable Assemblies,
Connectors, and
Wiring
. . Panel Light
l s Upper Exterior
Panel
l . Upper Interior
Panels
(3)
Maintenance
Function
Inspect
Repair
Inspect
Repair
Inspect
Repair
Inspect
Repair
Inspect
Repair
Inspect
Test
Replace
Repair
Inspect
Replace
Inspect
Replace
Repair
Inspect
Replace
Repair
Inspect
Test
Adjust
Repair
Inspect
Repair
(4)
Maintenance Level
Unit
C
0.1
0.1
0.1
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0
0.1
0.1
0.2
0.1
0.2
0.2
0.5
0.1
0.1
0.1
0.1
DS
F
0.2
0.2
0.5
0.3
0.3
0.3
0.5
0.1
0.3
1.0
0.3
0.3
0.1
0.4
0.1
0.2
GS
H
2.0
Depot
D
(5)
Tools and
Equipment
1
1
1
1,5
1
1
1,2,16
1,9
1
1
1,8
1
1,2,16
1
1
1,2,7
1
1
1
(6)
Remarks
C, K
C
C
L
C
B, M
C
M
C
M
B-5