TM 10-4610-239-10
TM 08580B-10/1
(4)
Roll up electrical cords on pumps.
k.
Shut off Generator Unit according to applicable manual for generator.
I.
Prepare hoses, pumps, and tanks for movement:
(1)
Disconnect all hoses from ROWPU panel and install caps on panel hose connections.
(2)
Remove hoses from pumps (all except chemical feed pump) and separate hoses.
(3)
Remove all hose adapters and distribution nozzle. Put adapters and nozzle into Storage Box No. 2.
(4)
Roll all rubber hoses and connect the ends.
(5)
Drain and roll canvas hoses, starting with male end (male end goes on the inside, female end on the
outside).
(6)
Put caps on all openings of portable pumps.
(7)
Remove covers from all water storage tanks. Fold covers.
(8)
Drain and deflate all storage tanks, remove valve from backwash tank, and cover tank openings.
CAUTION
If any water remains in tanks, tip tanks and drain water. Dry tanks before
folding.
(9)
Fold up tanks.
(10) Fold up ground clothes.
(11) Pull out ground rods using slide hammer and store on ROWPU control panel (fig. 2-39).
m.
Refer to loading plan attached to each storage box lid and pack accessories as indicated. Be sure TDS
meter is packed in its case and is secure in Storage Box No. 2. Be sure in-line TDS meter is removed from control panel
and stored securely in Storage Box No. 3.
n.
Install pumps, storage boxes, pails, hoses, sledge hammer, aluminum paddle, and tanks on ROWPU. Refer
to paragraph 1-6, (fig. 1-3 through 1-15) as a general packing guide.
o.
(Army) Install trailer cross braces.
p.
(Army) Refer to fig. 2-81 and prepare trailer for movement.
2-91