2-32 WATER TANK MAINTENANCE.
For unit level maintenance of the water tank, refer to TM 5-5430-225-12&P.
For unit level maintenance of the generator set, refer to TM 5-6115-465-12.
2-34. ROWPU MAINTENANCE (WPES-1).
This task consists of:
a. Removal
b. Installation
INITIAL SET-UP:
Tools Required
General Mechanics Tool Kit (Appendix B, Section III, Item 4).
Hoisting sling (10 ton minimum capacity)
Crane or lifting device (10 ton minimum capacity)
Personnel Required
Four (4)
Materials/Parts
Compound, locking (Appendix c, Section II, Item 9)
Lockwasher (16) - MS35338-50
Equipment Condition
Reference
ROWPU prepared for movement, all loose accessories removed (TM 10-4610-240-10).
Landing jacks set (TM 10-4610240-10).
Generator set removed.
General Safety Instructions
WARNING
Weight of ROWPU is 11,380 pounds (6 tonnes) To prevent injury to personnel and damage to
the equipment, use proper lifting equipment rated at 10 tons (9.1 tonnes) or greater.
Lack of attention or being in an improper position during lifting operations can result in
serious injury or death. Pay close attention to movements of equipment being lifted. Do not
stand under or in a position where you could be pinned against another object. Watch your
footing.
REMOVAL
a. Position ROWPU (2) and trailer (4) on flat level surface and chock trailer wheels
b. Remove 16 bolts (7), lockwashers (6), and flatwashers (5) from bottom of trailer (4)
2-144