TM 10-4610-240-24
TM 08580C-24/2
TO 40W4-13-22
2-79. CONTROL VALVE MAINTENANCE - continued.
INSTALLATION
a
Apply anti-seize tape to male pipe fittings. Be sure to wrap tape in same direction as pipe thread.
b
Install nipple (25), elbow (26), and adapter (39) on control valve (47)
c
Install nipple (20), elbow (14) and adapter (15) on control valve (47).
d
Install nipple (8) and elbow (9) on control valve (47).
e
Install adapter (4) on control valve (47).
f.
Install pipe assembly (36) on bottom of control valve.
g
Position control valve (47) and attached parts in unit.
h.
Install U-bolts (44) and two lockwashers (38) and nuts (37), on adapter (39).
i.
Install gasket (42), two clamp halves (41), screws (43), and nuts (40)
j.
Install gasket (32), two clamp halves (33), screws (34), and nuts (35).
k.
Install gasket (16), two clamp halves (17), screws (18), and nuts (19).
1.
Install gasket (10), two clamp halves (11), screws (12), and nuts (13).
m.
Install gasket (3), two clamp halves (2), screws (1), and nuts (7).
n
Connect metal tube (46) and tee (28) to tee (45).
o
Connect ten plastic tubes (31, 30, 27,29,22,24, 23, 21,5 and 6) Be sure to connect tubes as marked
during removal.
p.
Operate ROWPU (TM 10 461-24(}10).Check for leaks and proper operation.
2-280