TM 10-4610-240-24
TM 08580C-24/2
TO 40W4-13-22
3-24. ELECTRICAL CABLE W50 (CHEM FEED) PUMP) MAINTENANCE- continued.
g.
Carefully pull three wires (9) into conduit box (2) until adapter (6) is positioned in hole in conduit box.
h.
Position cable grip nut (18) on three wires (9) and install cable grip nut (18) on cable adapter (6).
i.
Position wire lug (17) as tagged on inside of conduit box (2) and install screw (16).
j.
Pull two wire bundles (1) out of conduit box (2) far enough to work on wire lugs and connecting hardware.
k.
Remove nut (13), lockwasher (14), three wire lugs (9), and flat washer (8) from screw (7) on each wire bundle
(1).
I.
Install flat washer (8), four wire lugs (9) as tagged, lockwasher (14), and nut (13) on screw (7) on each wire
bundle (1).
m.
Using electrical tape (3), tape end of each wire bundle (1) to completely cover all hardware, including tube
portion of all wire lugs.
n.
Secure electrical tape (3) on each wire bundle (1) with twine (15).
o.
Position two wire bundles (1) In conduit box (2).
p.
Position gasket (12) and conduit box cover (11) on conduit box (2) and install four screws (10).
q.
Tighten nut (4).
r.
Route chemical feed entering pump cable assembly (3) across ROWPU deck and install two cable clamps
(19), flat washers (21), and screws (20).
s.
Perform operating procedures.
3-148