TM10-4610-240-24
TM 0850C-242
TO 40W4-13-22
3-56. WIRING HARNESS W9 (DISTRIBUTION PUMP) MAINTENANCE.
This task consists of:
a.
Removal
b.
Inspection
c.
Test
d.
Disassembly
e.
Assembly
f.
Installation
INITIAL SET-UP:
Tools Required
General Mechanics Tool Kit (Appendix B, Section III, Item 4).
Soldering Gun Kit (Appendix B, Section III, Item 3).
Multimeter (Appendix B, Section III, Item 3).
Electrical Repair Kit (Appendix B, Section III, Item 3).
Crimping Tool (Appendix B, section III, item 3).
Wire Stripper (Appendix B, Section III, Item 3).
Material/Parts
Tape Electrical (Appendix C, Section II, Item 31).
Equipment Condition
ROWPU shutdown (TM 10-4610-240-10).
REMOVAL
For removal procedures, refer to paragraph 346.
INSPECTION
TEST
DISASSEMBLY
ASSEMBLY
INSTALLATION
3-302