Connect tube section (11) to barbed adapter (9) on OUTLET port of chemical cartridge (8). Position
hose clamp (10) over barbed adapter, then tighten clamp.
(12)
Connect other end of tube section (11) to barbed adapter (13) on INLET port of nuclear cartridge (14).
Position hose clamp (12) over barbed adapter, then tighten clamp.
(13)
Connect tube section (17) to barbed adapter (15) on OUTLET port of nuclear cartridge (14). Position
hose clamp (16) over barbed adapter, then tighten clamp.
(14)
Install male coupling (22) and bushing (20) on pipe coupling (21).
(15)
Install barbed adapter (19) on bushing (20).
(16)
Connect tube section (17) to barbed adapter (19) and install hose clamp (18). Position hose clamp
(18) over barbed adapter, then tighten clamp.
g.
Setup Product Water System. Refer to figure 2-80. Working from the ROWPU control panel to product
water dispensing point, connect components of the product water system with the nuclear and chemical filter
system as follows:
WARNING
To prevent contamination of product water system, do not use discharge hoses intended for raw
or brine water in the product water system. Product water hoses are identified by a blue stripe
running the full length of the hose.
(1) Position and setup two product water tanks in accordance with TM 5-5430-227-12&P/TO 37A12-1-121.
(2)
Install adapter on product water tank No. 1 and plug in tank inlet coupling.
(3)
Install adapter on product water tank No. 2 outlet coupling and plug in tank inlet coupling.
(4)
Connect suction hose and canvas discharge hose to PRODUCT WATER coupling on control panel.
Place end of canvas discharge hose in product water tank No. 1.
(5)
Connect suction hose between adapter on outlet coupling of product water tank No. 1 and suction
coupling of raw water pump No. 1.
(6)
Connect gate valve (1, figure 2-79) of nuclear and chemical filter system to discharge coupling on raw
water pump No. 1.
(7)
Connect discharge hose (figure 2-80) to male quick disconnect coupling (22, figure 2-79) on nuclear
and chemical filter system. Place other end of discharge hose in top of product water tank No. 2
(figure 2-80).
(8)
Connect suction hose between product water tank No. 2 outlet adapter and distribution pump suction
coupling.
(9)
Connect discharge hose to discharge coupling on distribution pump.