TM 10-4610-241-24
TO 40W4-13-42
2-45.1. 3-WAY BALL VALVE (BACKWASH) REPAIR (Models H-9518-1, H-9518-2, and H-9518-3).
This task consists of:
a. Removal
d. Inspection
g. Installation
b. Disassembly
c. Cleaning
e. Repair
f. Assembly
INITIAL SET-UP:
Tools Required
General Mechanics Tool Kit (Appendix B, Section III, Item 4)
Vise (Appendix B, Section III, Item 3)
Pipewrench (Appendix B, Section III, Item 3)
Material/Parts Required
Tape, Anti-seize (Appendix C, Section II, Item 19)
Detergent (Appendix C, Section II, Item 5)
Lubricant, O-Ring (Appendix C, Section II, Item 11)
Rags, Wiping (Appendix C, Section, II, Item 14)
Lo&washers (TM 10-4610-241-24P)
Packing and Seal Kit (TM 10-4610-241-24P)
Equipment Condition
Reference
Power shut down (Power Source Manual).
ROWPU Piping drained (TM 10-4610-241-10).
Personnel Required
Two
General Safety Instructions
WARNING
ROWPU piping and equipment can contain extremely high pressure during and after
operation. If this pressure is not relieved before performing maintenance, serious injury
or death may result. Be sure to open all drains and vents before performing maintenance.
a .
Removal
(1)
Remove nut (1), lockwasher (2) and handle (3) from 3-way valve (25). Install nut (1) and lockwasher (2) on
3-way valve (25).
(2)
Remove two nuts (4), bolts (5) and clamp halves (6). Slide gasket (14) onto elbow (17).
(3)
Remove two nuts (7), bolts (8) and clamp halves (9). Slide gasket (13) onto adapter (20).
(4)
Remove two nuts (10), bolts ( 11) and clamp halves ( 12). Slide gasket (I 5) onto adapter ( 19).
(5)
Loosen four setscrews ( 16).
(6)
Remove 3-way valve (25) and attached parts from back of control panel and remove gaskets (13, 14 and 15)
from elbow (17) and adapters (19 and 20).
2-188.2 Change 1