TM 10-4610-241-24
TO 40W4-13-42
2-50.
PRESSURE GAGE (R.O.) REPLACE - continued.
(4)
If removed, install nipples (10,11 and 12) on distribution block (4).
(5)
Install distribution block (4) on pressure gage (8).
(6)
Connect three tubes (1, 2, and 3) to distribution block (4) and tighten tube nuts.
(7)
Operate ROWPU (TM 10-4610-241-10). Check for leaks and proper operation.
2-201