TM 10-4610-244-13
TM 09476B-13/1
4-25. REPLACE/REPAIR FRAME.
This task covers:
a.
Disassembly
b.
Repair
c.
Assembly
INITIAL SETUP:
Tools:
Equipment Condition:
Tool Kit, General Mechanics (Appendix B,
Proportioning pump removed
Sec. III, Item 1)
(Paragraph 4-17).
Mainline piping assembly removed
(Paragraph 4-19).
Reservoir removed (Paragraph 4-23).
Accessory box removed (Paragraph 4-24).
4-35