TM 10-4610-246-13
Section III. OPERATION UNDER USUAL CONDITIONS
2.5
PREPARATION FOR USE.
a.
Remove the hypochlorination unit from its packing crate. Dispose of packing crate according to local SOP.
b.
Remove cover (2, Figure 2-2) from reservoir (4) by loosening velcro straps (5) and removing reservoir lid.
c.
Remove and retain technical manual from tool box (3).
d.
Select a site that allows for free movement by the operator around the equipment during operation.
e.
Place the hypochlorination unit in a position that prevents hypochlorite solution from spilling from the reservoir
(4).
f.
Remove quick disconnect plug (12) from the female coupling (1) on manifold inlet (11).
g.
Connect hose (13) from water supply to female coupling (1) on manifold inlet (11).
h.
Remove quick disconnect cap (9) from male coupling (7) on manifold outlet (10).
i.
Connect discharge hose (8) to male coupling (7) on manifold outlet (10).
j.
Position drain line (6) to direct water flow away from unit.
Figure 2-2. Preparation for Use
2-9
