TM 10-4610-246-13
I. Open drain valve (11) on ratio-feeder assembly (10) and drain. With drain valve (11) open, tip unit as necessary
to drain all water.
m.
Remove vent plugs (7 and 9) and drain plug (8) from ratio-feeder assembly (10). Allow water to drain from
ratio-feeder assembly. Replace vent plugs and drain plug.
n.Place chlorine test kit in tool box (2).
o.Install quick disconnect cap (15) on male coupling on manifold outlet.
p.Install quick disconnect plug (18) onto quick disconnect coupling on manifold inlet.
q.Place cover assembly over unit and secure at four corners with tie ropes. The hypochlorination unit is now ready
for transport or storage.
Figure 2-8. Preparation for Movement
2-19