TM 10-4610-246-13
1.3
CORROSION PREVENTION AND CONTROL (CPC).
Corrosion Prevention and Control (CPC) of Army materiel is a continuing concern. It is important that any corrosion
problems with this item be reported so that the problem can be corrected and improvements can be made to prevent this
problem in future items. While corrosion is typically associated with rusting of metals, it can also include deterioration of
other materials, such as rubber and plastic. Unusual cracking, softening, swelling, or breaking of these materials may be a
corrosion problem. If a corrosion problem is identified, it can be reported using Standard Form 368, Product Quality
Deficiency Report. Use of keywords such as "corrosion", "rust", "deterioration", or "cracking" will ensure that the
information is identified as a CPC problem. The form should be submitted to the address specified in DA PAM 738-750.
1.4
DESTRUCTION OF ARMY MATERIEL TO PREVENT ENEMY USE.
Refer to TM 750-244-3, Procedures for Destruction of Equipment to Prevent Enemy Use.
1.5
REPORTING EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIRs).
If your pump unit needs improvement, let us know. Send us an EIR. You, the user, are the only one who can tell us what
you dont like about your equipment. Let us know why you dont like the design or performance. Put it on an SF 368
(Product Quality Deficiency Report). Mail it to us at Commander, U.S. Army Aviation and Troop Command, ATTN:
AMSAT-I-MDO, 4300 Goodfellow Blvd, St. Louis, Missouri 63120-1798. Well send you a reply.
1.6
WARRANTY INFORMATION.
The hypochlorination unit is warranted for 12 months. The warranty starts on the date found in block 23, DA Form 2408-9
in the logbook. Report all defects in material and workmanship to your supervisor, who will take the appropriate action.
1.7
REFERENCE INFORMATION.
a. Nomenclature Cross-Reference List.
Common Name
Official Nomenclature
Hypochlorination Unit
Hypochlorination Unit, 350 GPM Model WAL001HYPO
b. List of Abbreviations/Acronyms.
App.
Appendix
Approx
approximately
C
Celsius
CPC
Corrosion Prevention and Control
EIR
Equipment Improvement Recommendations
F
Fahrenheit
FM
Field Manual
Gals
gallons
GPM
Gallons per Minute
lAW
in accordance with
max
maximum
min
minimum
NBC
Nuclear, Biological, Chemical Warfare
NSN
National Stock Number
para
paragraph
PMCS
Preventive Maintenance Checks and Services
p/n
part number
ppm
parts per million
psig
pounds per square inch gage
1-3