TM 5-4610-223-12
Section II. MAINTENANCE ALLOCATION CHART - Continued
(1)
(2)
(3)
(4)
(5)
(6)
*Maintenance
Category
Group
Component/
Maintenance
Tools and
Number
Assembly
Function
C
O
F
H
D
Equipment
Remarks
Fittings:
Replace
0.2
Gage Mountings.
Filter gage mounting:
Replace
0.4
Raw water rate of
flow indicator
mounting:
Replace
0.4
Flow Meters:
Raw water rate of
flow indicator:
Service
0.2
Inspect
0.2
Replace
0.5
Test
0.5
Calibrate
0 5
Overhaul
1 0
Orifice plate gasket,
Replace
0.5
orifice plate:
Replace
0.5
10
WATER PURIFICATION
Tanks, Containers:
Feeder assembly,
chemical slurry:
Service
0.5
Inspect
0.5
Repair
3.0
Replace
5 0
Plastic Windows and
gaskets:
Inspect
0.2
Repair
0.5
Door Latches:
Inspect O0.2
Replace
0.5
Bearing packing:
Adjust
0.5
Replace
1.0
Feeder, chemical
solution, water puri-
fication:
Service
0.5
Inspect
0.5
Repair
2.5
Replace
1.5
Overhaul
5 0
*Subcolumns are as follows:
C - Operator/Crew
O - Organizational
F - Direct Support
H - General Support
D - Depot
D-11