TM 5-4610-233-13&P
INSPECT
a. Inspect frame for breaks, cracks, holes, broken welds, and dents. Replace as required.
b. Inspect name plates for damage. Replace as required.
INSTALL
a. Install two name plates (2) and eight screws (1).
b. Install flow controller. Refer to paragraph 4-26.
c. Install solution feed pump. Refer to paragraph 4-19.
d. Install manifold assembly. Refer to paragraph 4-29.
e. Install reservoir tank assembly. Refer to paragraph 4-10.
f. Install tool box. Refer to paragraph 4-9.
END OF TASK
Section VI. PREPARATION FOR STORAGE OR SHIPMENT
4-34. PRESERVATION, PACKAGING, MARKING, AND SHIPPING REQUIREMENTS. Refer to MlL-P-116
for preservation, packaging, marking, and shipping requirements.
4-35. ADMINISTRATIVE STORAGE REQUIREMENTS. Administrative storage of equipment issued to and
used by Army activities will have preventative maintenance performed in accordance with the PMCS charts
before storing. When removing the equipment from administrative storage, the PMCS should be performed to
assure operational readiness.
4 - 44
