DO'S AND DON'TS FOR SAFE OPERATION
DO'S
1.
CHECK lubricant before operating the hoist.
2.
EXAMINE hoist before each shift. CHECK for
damaged hooks or chains, also make sure the
hoist is properly secured. Make sure your hoist
is clean and well lubricated.
3.
CHECK daily the chain for improper seating,
twisting, kinking, wear or other defects before
twisting, kinking, wear or other defects before
operating the hoist. If these are not checked,
the chain may break under a normal load.
4.
BE SURE there are no objects in the way of a
load or hook when moving the hoist on the
trolley.
5.
MAKE SURE a load clears neighboring stock
piles or machinery when raising or lowering the
load.
6.
CENTER hoist unit over the load before lifting.
7.
AVOID swinging of load or load hook when
traveling the hoist.
8.
PROPERLY
secure
outdoor
hoist
when
unattended time and DO NOT leave a load
unattended during
9.
KEEP load block above head level when not in
use.
10. BE SURE the sling is properly seated in the
saddle of the hook. Tip loading leads to
spreading and possible failure.
DON'TS
1.
NEVER lift load with hoist until all personnel are
clear.
2.
DO NOT allow any unqualified personnel to
operate hoist.
3.
AVOID collisions or bumping of hoists.
4.
DO NOT transport load over personnel.
5.
NEVER carry personnel on the hook or the load.
6.
DO NOT operate hoist if you are not physically
fit to do so.
7.
NEVER pick up a load beyond the capacity
appearing on the hoist.
8.
DO NOT tamper with any parts of the hoist
unless you are a qualified maintenance man.
9.
NEVER use the hoist chain as a sling.
10. DO NOT use chain as ground for welding.
NEVER touch the welding electrode to the
chain.
11. DO NOT divert attention from load while
operating hoist
12. DO NOT leave a load suspended in the air at
the end of a work shift, or for extended periods
of regular working hours.
13. DO NOT tip or "point" load a hook.
Recommended Spare Parts List for Chester Zephyr Low Head Room
Plain and Geared Trolley Hoists
CATALOG NO._______________
CAPACITY ________________
Quantity
Part No.
Description
1
C-9301
Pawl Stud
1
C-908
Pawl Snap Ring
1
C-910
Pawl Spring
1
C-923
Pawl
1 pr.
C-934
Brake Discs
1
C-935
Ratchet
2
C-9329
Load Wheel only for 1-1/2, 2, 3, 4, 8, or 16-ton capacity units
C-9274
C-9374
Bull Gear Shaft
(Sold in combination only for 5 & 6, 10 & 12,
2
C-9390
Bull Gear
20 & 24-ton capacity units.)
C-9329
Load Wheel
2 pcs.
C-938-2
_______' _______" lineal load chain
2 pcs
C-38
_______' _______" lineal load chain
C-38-1/2A or C-38-3 Required
C-9203-P
Plain Trolley only
Depends Upon Hoist Capacity
C-9203-G
Geared Trolley Wheel only
CHESTER HOIST DIVISION MONOGRAM INDUSTRIES PHONE (216) 424-7248 LISBON, OHIO, U.S.A. 44432
3
REPAIR PARTS ORDERING INFORMATION