TM 55-1930-209-14&P-13
i. Use trolley lateral movement chain (Figure 2-1) to move trolley so load is at exact position for unloading.
j. Use trolley hoisting chain to lower load when 2-ton electric hoist is not installed. If 2-ton electric hoist is used,
press DOWN button on hand control (Figure 2-6) to lower load.
k. Remove lifting rig and return to storage.
I. If used, remove 2-ton electric hoist from 5-ton hoist and return to storage.
m. Raise trolley hook to top position by using hoisting chain. Return bridge crane to aft end of ROWPU space.
Table 2-1 . Weights, Measurements, and Locations of Movable Equipment in Voids and Deckhouse
Equipment
Weight (dry/wet)
Length
Width
Height
Location
Media filter
5000/9217 lb
56.0 in
48.0 in
82.0 in
ROWPU space
155 kW diesels
3960/4180 lb
118.0 in
39.0 in
59.0 in
Void 4 port/
starboard
20kW diesel
1300/1451 lb
74.0 in
26.0 in
40.0 in
Void 4 starboard
HP pump
5760/5980 lb
101.0 in
75.0 in
82.0 in
ROWPU space port
assembly
and starboard
HP pump diesel
3960/4180 lb
80.0 in
31.0 in
75.0 in
ROWPU space port
engines
and starboard
HP pump
2800 lb (dry)
35.0 in
25.0 in
35.0 in
ROWPU space port
and starboard,
spare in void 4
starboard
Spare diesel
3900 lb (dry)
72.0 in
56.0 in
56.0 in
Void 4 port
Air compressor
425 lb (dry)
53.0 in
26.0 in
57.0 in
ROWPU space port
Reverse Osmosis
4000/6144 lb
229.0 in
53.0 in
92.0 in
ROWPU space port
(RO) block
and starboard
RO pretreatment
1518/1672 lb
111.0 in
39.0 in
71.0 in
ROWPU space port
skid
and starboard
Drill press
275 lb (dry)
72.0 in
56.0 in
70.0 in
Workshop
2-10