TM 55-2090-201-14&P
4-37.
MOUNTING FRAME - TYPE C AND D SEPARATORS.
This task covers:
a.
Removal
c.
Inspection
e.
Installation
b.
Cleaning
d.
Repair
INITIAL SETUP
Test Equipment
None
Tools
Arc welder
Welding rods
Tool Kit, General Mechanics
Material/Parts
Sealing compound
Appendix C. Item No. 6
Paint, MIL-P-23236, Type II, Class 3
Appendix C. Item No. 4
Mounting frame
Cleaning solvent, PD-680
Appendix C. Item No. 2
Clean cloths
Buckets
Personnel Required
1
Equipment Condition
L O C A T I O N
ITEM
A C T I O N
R E M A R K S
R e m o v e
1.
Draining a. With the pump (1) running
system
discharge as much oil as
possible from the separator
stages according to the
following:
(1) Open the oil discharge
valve (2 or 3) on either
the first (prefilter)
or second stage (4 or
5).
4-182