Figure 2-65. R.O. Pump High Pressure Lamp
ab. Watch water level in product water tanks.
(1) Keep tanks covered.
(2) To distribute water, start distribution pump.
ac. To start distribution pump.
(1) Set DISTRIBUTION PUMP switch on control box assembly panel to START.
(2) Green lamp comes on.
(3) Run distribution pump until user has enough, then switch to STOP.
(4) If product water tank is full, stop ROWPU until more water is needed. (See para. 2-31 for
normal shutdown procedure.)
Figure 2-66. Distribution Pump Switch
2 - 69
TM 10-4610-215-10
TM 08580A-10/1