TM 10-4610-239-10
TM 08580B-10/1
Figure 2-40. Junction Box
2-23.
INITIAL ADJUSTMENTS AND CHECKS.
a.
Drain Valves. Close all drain valves. Drain valves must remain closed at all times during operation.
NOTE
You will find all seven drain valves to the left front of the ROWPU as shown.
2-54