TM 3-4230-237-10
0019 00
OPERATOR'S PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) Continued
Table 1. Quarterly and Annual PMCS for M12A1 DED Decontaminating Apparatus - Continued.
15
14
16
Item
Interval
Man
Item to be
Procedure
Not Fully
Mission
No.
Hour
Checked/
Capable If:
Serviced
a. Inspect that the two lubrication fittings on the
Hose Reel
QUARTERLY
14
swivel pipes are clean and not broken.
item 20).
a. Inspect that the chains connected to the dust
Connector
QUARTERLY
15
caps are in good condition and are securely
Panel
fastened.
b. Clean connector panel with hot soapy water and
rinse with clear water.
a. Inspect for missing hardware or parts.
Frame
QUARTERLY
16
Assembly
b. Inspect for broken welds or dents.
c. Wash with hot soapy water. Rinse with clear
water. Remove any rust and corrosion with a wire
0019 00-9