j. R.O. Vessel Installation. (Figure 2-85)
NOTE
Pipe unions are not tightened until elements are installed. Apply
Teflon tape to pipe threads before making connections.
(1) Slide R.O. vessel (5) into ROWPU frame from front side and seat in frame channel (6).
(2) Locate two brackets (4) on R.O. vessel (5) and ROWPU frame channel (6).
(3) Insert four bolts (3) into two brackets (4) and frame channel (6).
(4) Install four lockwashers (2) and four nuts (1) on bolts (3).
k. R.O. Vessel Piping Installation. (Figure 2-83) (ARMY)
(1) Install coupling (6) and install pipe assembly (7) to R.O. vessel (9).
(2) Place two sections of pipe clamps (5) and slide rubber grommet (8) over pipe joint of pipe assembly
(7) and R.O. vessel (9).
I.
(9).
(3)
(4)
(5)
(6)
(7)
(8)
(9)
Insert two bolts (4) through pipe clamp (5).
Install two nuts (3) on bolts (4).
NOTE
Repeat steps (1) through (4) to install pipe on opposite end of
R.O. vessel.
Slide hose clamp (2) over plastic tubing (1).
Slide hose (1) over pipe on R.O. vessel (9).
Tighten clamp (2) over pipe on R.O. vessel (9).
Tighten two nuts (3).
Check all fittings for leaks.
R.O. Vessel Piping Installation. (Figure 284) (USMC)
(1) Place two sections of pipe clamps (5) and slide rubber grommet (8) over coupling (7) and R.O. vessel
(2) Insert two bolts (4) through pipe clamp (5).
(3) Install two nuts (3) on bolts (4).
(4) Place two sections of pipe clamp (5) with rubber grommet (8) over coupling (6) on middle two pressure
vessels (9).
(5)
(6)
(7)
(8)
(9)
(10)
(11)
2-170
Insert two bolts through pipe clamps (5).
Install two nuts (3) on bolts (4).
NOTE
Repeat step (1) through (6) to install pipe to opposite end of
pressure vessel.
Slide hose clamps (2) over plastic tubing (1).
Slide plastic tubing (1) over hose adapter on R.O. vessels (9).
Tighten clamps (2) over hose adapter on R.O. vessels (9).
Tighten two nuts (3).
Check all fittings for leaks.