TM 10-4610-215-24
TM 08580A-24/2
h. Installation of Drain Pipe. (Typical. (Figure 299)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
Place pipe assembly (8) in approximate position in ROWPU frame.
Locate tube support (7) over tubes.
Insert bolt (6) through tube support (7).
Install, but do not tighten, two lockwashers (5) and two nuts (4).
Repeat steps (1) through (4) for each tube and tube clamp.
Connect coupling and tighten nut (2) to valve (1).
Connect coupling and tighten nut (3) to ROWPUapplicable component.
Tighten all nuts (4) on tube support (7).
Perform operational test and check all fittings for leaks.
Section V1. STORAGE OR SHIPMENT
2-83. ADMINISTRATIVE STORAGE.
a. Placement of equipment in administrative storage should be for short periods of time when a shortage of
maintenance effort exists. Items should be in mission readiness within 24 hours or within the time factors as
determined by the directing authority. During the storage period appropriate maintenance records will be kept.
b. Before placing equipment in administrative storage, current maintenance services and equipment
serviceable criteria (ESC) evaluations should be completed, shortcomings and deficiencies should be corrected,
and all modification work orders (MWOS) should be applied.
c. Storage site selection. Inside storage is preferred for items selected for administrative storage. If inside
storage is not available, trucks, vans, conex containers and other containers may be used.
2-84. PREPARATION FOR STORAGE OR SHIPMENT. Prepare ROWPU for storage or shipment as directed in
paragraph 2-31 of Operators Manual, TM 10-4610-215-10 (ARMY) and TM 08580A-10/1 (USMC).
2-197/(2-198 blank)