TM 10-4610-215-24
TM 08580A-24/2
(6) Inspect base and overload relay mounting bracket for fractures or bent surfaces.
(7) Inspect overload relay body for cracks, fractures, or chips.
(8) Inspect reset lever for free movement.
(9) Inspect contact areas for burning or cracks.
f. Repair or Redate.
(1) Replace all damaged nuts, bolts, screws, and washers.
CAUTION
If heater element has been burned out, replace entire overload
relay including a new heater element.
(2) Replace damaged or unserviceable overload relays.
(3) Repair, straighten, rework, or replace mounting brackets with minor dents, bends, or breaks.
g. Reassembly. (Figure 3-12)
(1) Position spindle (27) of overload relay (7) and install with two screws (26).
(2) Position heating element (25) on overload relay (3) and install with two screws (24).
(3) Position mounting bracket (20) on overload relay (3) and install with two screws (21) and two
lockwashers (22).
(4) Position mounting bracket (20), with overload relay (3) attached, on base (13) and install with two
screws (19).
(5) If applicable, repeat steps (1) thru (4) for the two additional overload relays (7) and (8) and mounting
bracket (23).
(6) Position stationary contact block assembly (5) on base (13) and install with two bolts (16)
(7) Install movable contacts (17) and springs (18) into movable contact support assembly (12).
3 - 6 0