TM 10-4610-229-10
2-8. SHUTDOWN (CONT)
5
Flip boost pump control switch down. Engine will stop.
6
Flip raw water pump control switch down. Engine will stop. Shutdown is now completed.
2-9. PREPARATION FOR MOVEMENT
1
Shut down system (para 2-8).
2
Remove control box cable from socket on high pressure pump. Store cable on pretreatment assembly.
3
Remove filler cap and feeder tube from each 55-gallon chemical drum. Store on pretreatment assembly.
4
Install cover caps on each 55-gallon chemical drum.
5
Disconnect any auxiliary fuel tanks.
6
Disconnect all hoses.
7
Remove cartridge filter elements (para 3-5) and discard.
CAUTION
Reverse osmosis membrane elements must be packed within a short time after removal to prevent
damage from dehydration. Organizational maintenance is responsible for packing elements and
must be notified before they are removed from pressure tubes.
8
Remove elements from pressure tubes (para 3-9).
9
To put back in operation, refer to para 2-4 and para 2-5.
2-132