TM 10-4610-229-10
3-9. REVERSE OSMOSIS MEMBRANES REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Personnel Required
Crowfoot wrench, item 6, section III,
Two
appendix B
Element removal tool, item 5,
Equipment
section III, appendix B
Condition
Extension, item 1, section III
Para
Condition Description
appendix B
Supplies
2-8
System shut down.
Silicone lubricant, item 5,
appendix D
Tags, item 13, appendix D
a.
Removal
NOTE
This procedure begins at product water end of reverse osmosis block assembly.
1
Tag all rigid and flexible tubes. Loosen rigid tube nut.
2
Loosen rigid tube nut at manifold. DO NOT remove. Swing tube away from end cap assembly.
3
Loosen flexible tube nut. Remove flexible tube from end cap.
3-27