TM 10-4610-232-12
(5)
Check to see whether the equipment has been modified.
e.
Preliminary Servicing and Adjustment of Equipment.
(1)
Check warnings at the front of this manual.
(2)
Lubricate the ROWPU using lubrication order LO 10-4610-232-12.
(3)
Adjust bolt tension and align motor sheaves on the high pressure pump (para. 4-81).
(4)
Adjust belt tension and align motor sheave on the air compressor (para. 4-78).
(5)
Check charge on fire extinguisher. Replace if necessary (para. 4-23).
(6)
Service eyewash station (para. 3-15).
(7)
Fill the 5 gallon water container with potable water.
(8)
Open the cartridge filter top and check that filters are installed. Install filters, if missing (para. 4-44).
(9)
Check that air compressor inlet filter is installed. Install if missing (para. 3-33).
(10)
Check that air compressor outlet filter is installed. Install if missing (para. 3-31).
(11)
Check serviceability of turbidity motor air dryer (para. 3-27). (MODEL WTA-060 ONLY)
(12)
Check shelf life on chemicals in ROWPU. Replace as necessary.
(13)
Check shelf life on ship loose chemicals. Replace as necessary.
(14)
Install RO elements (para. 3-28).
(15)
Service generator, install batteries and bolts. Refer to TM 5-6115-545-12.
(16)
Service trailer. Refer to TM 9-2330-358-14 or TM 9-2330-385-14&P.
f.
Deprocessing Unpacked Equipment.
(1)
Check that generator support brackets are torqued to 99 ft-lbs.
(2)
Check high pressure pump assembly mounting straps for tightness, wear, cracking or chafing. Replace as
necessary.
(3)
Remove desiccant from main control panel.
(4)
Check and secure trailer/van bolster locks.
(5)
Repack the ROWPU. Refer to para. 2-28 for procedures.
4-2 Change 7