TM 10-4610-232-12
Table 4-1. Unit Preventive Maintenance Checks and Services
Item
No.
8.
9.
10.
11.
Interval
Semi-
Annual
Semi-
Annual
Semi-
Annual
Semi
Annual
Item To Be
Checked Or
Serviced
Raw Water Pump)
Frame, Cyclone
Separator Frame
and Distribution
Pump Assembly
Van Panels,
Electrical
External Cable
Assemblies
COEI and Bll)
High Pressure
Pump Assembly
Procedure
Check for loose and missing
hardware and rigidity of assembly
by manually grasping and shak-
ing the frame. Check for unusual
vibration, broken welds and bent
rails.
a. Check van panel external
eIectrical panels for water leak-
age and loose mountings (para.
4-33 to 4-35).
b. Remove threaded connectors.
Check for corroded, burnt or mis-
sing pins and inserts.
c. Check MOVs for damage and
continuity.
a. Check for cuts, cracks, dry rot
and damaged connectors.
b. Inspect for corroded, burnt,
loose or missing cable pins and
inserts.
c. Check connector boots for
signs of looseness and water re-
sistance in and on connector.
Seal with silicone sealant as re-
quired (Appendix E).
a. Check for missing, loose or
damaged drive belt guard hard-
ware and straight edge.
b. Check for loose or missing
hardware and rigidity of assembly
by manually shaking the frame.
Check for unusual vibration, bro-
ken welds and bent rails. Check
tie down straps for damage and
dry rot. Replace tie down straps
every two years.
c. Check pump and motor pul-
leys for wear, cracks and dam-
age.
Not Mission
Capable If:
Any component is dam-
aged, loose, missing or
broken.
Any pin or insert severely
burnt, missing or cor-
roded.
No continuity exists.
Any cable has dry rotted
insulation that will expose
wires or shorting.
Any cable damaged or
missing and no replace-
ment.
Any component is bro-
ken, loose, missing or
damaged
Any pulley damaged or
missing.
4-6 Change 2
