TM 10-4610-232-12
BACKWASH STEP 5: FORWARD FLUSH
OPERATOR RESETS CONTROL PANEL FOR NORMAL OPERATION AND OPENS V36
BY PUSH BUTTON.
OPERATOR CLOSES V37.
OPERATOR STARTS RAW WATER AND BOOSTER PUMPS.
V14 ADJUSTED FOR 100 GPM.
CYCLE TAKES 5 MINUTES.
PURPOSE: DURING THIS STAGE, THE MEDIA BED IS BEING REPACKED AND
SETTLED.
Figure 1-11. Backwash Cycle (Sheet 10 of 10)
(MODEL ROWPU-1 ONLY)
Change 12 1-20.5/(1-20.6 Blank)