TM 10-4610239-10
TM 08580B-10/1
Table 2-3. Operator/Crew Preventive Maintenance Checks and Services (Unit)
B-Before
D-During
A-After
W-Weekly
Interval
Procedures:
For readiness reporting
Item
Item to be
Check for and have repaired
Equipment is not
No.
B
D
A
W
Inspected
or adjusted as necessary
ready/available if:
1
ROWPU, General
Inspect the general appearance of
the unit, paying particular attention
to the words on identification
markings and the condition of the
paint. Inspect for rust, especially
on weldments.
Inspect for water leaks;
loose or missing bolts,
screws, nuts, and hoses.
Inspect for damage since
the equipment was last used.
Inspect for loose or broken
cable connections.
2
Tools and Equip-
Inspect tools and toolbox
ment
Good shape
Clean
All there
In proper place
Box mounts solid
Box closes properly
3
Vent and drain
Check vent and drain line
Lines are broken
lines
connections
or clogged
Solid
Any damage
No obstructions
4
Frame and equip-
Remove oil, grease, mud
ment
chemical spills, and other
matter from all parts of
the ROWPU. Use clean
cloths. Wash the floor with
product water.
5
Multimedia filter
Inspect for leaky gaskets,
Raw water will
and loose mountings. Notify
not flow through
unit maintenance if you
filter. Filter
find trouble. Check multi-
cannot be back-
media gage readings.
washed. Gage
Should read within 5 psid
reading exceeds
of initial log reading, and
either 5 psid of
in no case exceed 10 psid.
initial log reading
or 10 psid.
2-22