TM 10-4610-239-10
TM 08580B-10/1
n.
Position operational equipment as shown in fig. 2-30 before starting initial installation.
CAUTION
Avoid kinking or excessive looping of hoses.
NOTE
Illustration denotes Army model. MC unit is skid mounted.
1.
Float and strainer
12.
Brine water tank
2.
Three 1 1/2 inch suction hoses
13.
Brine 1 1/2-inch discharge hose
3.
Raw water pump
14.
Two 1 1/2-inch suction hoses
4.
Two 1 1/2 inch suction hoses
15.
Product water tank
5.
Raw water pump
16.
Product water 1 1/2-inch suction hose
6.
Three 1 1/2 inch discharge hoses
17.
Product water tank
7.
Backwash discharge hose (2-inch)
18.
Product water 1 1/2-inch suction hose
8.
Backwash pump
19.
Distribution pump
9.
Backwash 2-inch hard rubber hose
20.
Product water 1 1/2-inch canvas hose
10.
Waste water 2-inch discharge hose
21.
Distribution nozzle
11.
Vent vessels discharge hose (2-inch)
Figure 2-30. Typical Field Installation
2-43