TM 10-4610-240-24
TM 08580C-24/2
TO 40W4-13-22
2-57. FLOW METER (BACKWASH) MAINTENANCE - continued.
INSTALLATION
a. Apply anti-seize tape to male pipe fittings Be sure tape is wrapped in same direction as pipe thread
b. Install pipe sections (11) and (6) on flowmeter (10)
c. Position flowmeter (10) In cutout on control panel (20)
d. Install gasket (4), clamp halves (2), two screws (5) and nuts (1) on pipe sections (3 and 6).
e. Wrap pipe section (11) with insulating tape (17) and install ring filler (22) Install two-piece clamp (14) on pipe
section (11) and two studs (15)
f. Install two screws (18), lockwashers (13), and nuts (12) Tighten two nuts (16)
g. Position bracket clamp (9) on two studs (21) and install two lockwashers (8) and nuts (7).
h. Install cap (19) on pipe section (11)
i. Operate ROWPU (TM 10 4610-240-10). Check for leaks and proper operation.
2-210