TM 10-4610-240-24
TM 08580C-24/2
TO 40W4-13-22
Section VI. PREPARATION FOR STORAGE OR SHIPMENT
ALPHABETICAL INDEX
Para.
Administrative Storage ..........................................................................................................................
Preparation for Movement .....................................................................................................................
Security Procedures ..............................................................................................................................
2-103. SECURITY PROCEDURES.
Refer to AR 190-11 or 190-13.
2-104. PREPARATION FOR MOVEMENT.
Refer to TM 10-4610-240-10 to prepare the ROWPU for movement.
2-105. ADMINISTRATIVE STORAGE.
a. Placement of equipment in administrative storage should be for short periods of time when a shortage of
maintenance effort exists Items should be mission readiness within 24 hours or within the item factors as
determined by the directing authority. During the shortage period, appropriate maintenance records will be kept.
b. Before placing equipment in administrative storage, current maintenance services and equipment serviceable
criteria (ECS) evaluations should be completed, shortcomings and deficiencies should be corrected, and all
modification work orders (MWOs) should be applied.
d. Attach tag to pressure vessels that reads "R O. elements and end cap O-rings have been removed. Reinstall
before operating unit ".
e. Remove all chemicals, spare parts, and consumables from the ROWPU.
e. Install ROWPU cover.
f. Storage Site Section. Inside storage is preferred for items selected for administrative storage. If inside storage
is not available, trucks, vans, convex containers and other containers may be used.
2-390