TM 10-4610-241-24
TO 40W4-13-42
3-49.
CONTROL BOX ASSEMBLY REPAIR.-continued.
(4)
Terminal board.
NOTE
Tag all wires and terminal links, indicating their connection points before removal.
If tagged parts are to be turned in to Supply or discarded, be sure to transfer tags to
replacement parts.
There are three terminal boards in the control box. Removal of one is shown the
others are removed in similar manner.
(a)
Remove screws (31) and disconnect wires (32) from terminal board (37).
(b)
Remove terminal link (33).
(c)
At each end of terminal board (37), remove two nuts (34), lockwashers (35) and screws (36).
(d)
Remove terminal board (37) and information plate (38).
3-283