TM 10-4610-241-24
TO 40W4-13-42
3-59.
WIRING HARNESS, W39 REPAIR.
This task consists of
a.
Removal
b.
Cleaning
c.
Inspection
d.
Test
e.
Repair
f.
Installation
INITIAL SET-UP:
Tools Required
General Mechanics Tool Kit (Appendix B, Section III, Item 4)
Multimeter (Appendix B, Section III, Item 3)
Refer to TM 43-0158/TO 1-lA-15 (Air Force) for Tools required to repair Cable Assembly.
Material/Parts Required
Lockwashers and Tiedown Straps (TM 10-4610-241-24P)
Refer to TM 43-0158/TO 1-1A-15 (Air Force) for Materials/Parts required to repair Cable Assembly.
Equipment Condition
Reference
Junction Box removed from ROWPU and Cover open (Paragraph 3-53)
a.
Removal.
(1) Remove screws (1), and disconnect terminals (2) from termination points A and B (see table opposite page).
(2) Remove tiedown straps (3), securing wiring harness (4) to clamps (9) and other wiring.
(3) Remove wiring harness (4).
(4) As required, remove nut (5), lockwasher (6), flatwasher (7), screws (8) and clamps (9).
b.
Cleaning.
Clean wiring harness with a damp rag and allow to dry.
c.
Inspection.
Inspect wiring harness In accordance with TM 43-0158/TO 1-lA-15 (Air Force).
d.
Test.
Check wiring harness for continuity and shorts using table (opposite page) as guidance.
e.
Repair.
Repair wiring harness in accordance with TM 43-0158/TO 1-1A-15 (Air Force).
3-330