ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0030 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT MARINE CORPS
EXTENDED CAPABILITY MODULES
8. Pack the bag with the four wellpoints onto the TWPS as follows (see Figure 9):
a. Position the bag above the NBC tank near the front of the TWPS.
CAUTION
Do not overtighten the straps when securing the wellpoint storage bag to the
TWPS frame. Failure to observe this CAUTION may crack or break the wellpoints.
b. Using two 6-ft. ratchet straps, secure the bag to the diagonal TWPS frame members at
the top of the unit (1). Do NOT overtighten the straps.
1
WELLPOINT PACKOUT BAG
3-IN. OISS TEE
OISS SUCTION HOSES
Figure 9. Bag with OISS Wellpoints Packed onto MC-TWPS.
9. Insert the six 2 x 10 yellow-banded OISS suction hoses in the equipment area around the
previously packed equipment (see Figure 9). Using a 6-ft. ratchet strap, strap the upper ends of
the hoses to the TWPS frame near the instrument / solenoid panel.
10. Strap the 3-in., OISS tee to a High Pressure Pump support frame as follows (see Figure 9):
a. Feed one 36-in hook and loop strap through the straight part of the tee and secure the
strap around the pump support frame.
b. Wrap a second 36-in. hook and loop strap around the female end of the tee and the
pump support frame.
END OF WORK PACKAGE